8×8 Secure Facility With Architectural Finish for Executive

8x8 Secure Facility With Architectural Finish for Executive

QuietStar Secure worked closely with the ICD 705 Subject Matter Experts / Integrators to complete this project. The room met all unique requirements and exceeded the base requirements of 40dB RF and NIC 45. The client has a comfortable workspace with good aesthetics and high performance. The room can be removed with no damage or impact on the client’s home.

Quietstar Secure Provided

  • Design & Engineering Services
  • Thorough Submittal Package
  • IAC Acoustics Sentry® Secure Facility
  • Lamvin Sonic Wall Finishes
  • Sound Seal Impacta Underlayment
  • Steel Flooring
  • Carpet
  • Installation Oversight
  • Field Validation

Client Requirements

  • 8′ x 8′ workspace
  • ICD 705
    • Forced entry
    • Acoustic requirement
    • Tempest requirement
  • Architectural finish for executive appointment
  • Unique design requirements:
    • Must fit in basement of residence (inside existing finished room)
    • Must not disturb existing finishes

The Opportunity

In this instance an integrator reached out to Quietstar with the opportunity.

Quietstar Secure Provided:

  • Design & Engineering Services
  • Thorough Submittal Package
  • IAC Acoustics Sentry® Secure Facility
    • Panels & Joiners
      • Special RF / Tempest details on panels and joiners
    • Noise-Lock® Doors
      • Door hardware
  • Lamvin Sonic Wall Finishes
    • 1″ Sonic Panels
    • Full height
    • Covering all walls
    • Guilford of Maine Anchorage Fabric
    • Magnets – to mount to the IAC panels with no penetration
  • Sound Seal Impacta Underlayment
    • 10 mm ProBase®
  • Steel Flooring
  • Carpet
  • Installation Oversight
  • Field Validation
    (utilizing acoustic camera)

The Integrator Provided:

  • Construction Security Plan development
  • Fixed facility checklist development (where applicable)
  • TEMPEST requirements checklist development
  • Necessary forms and preprocessing information
  • Documentation preparation and support for Client / Government Accrediting Agency
  • All documentation on flash media or as specified by client/government AO
  • The Enclosure with QuietStar details
  • Intrusion Detection System
  • Communication / data
  • Waveguides
  • Electrical
  • Split Systems
  • On site project & construction management
  • Fire suppression
  • Installation / Construction
  • Turn over / Representation through the accreditation process
  • Construction photos where applicable and allowed
  • Checklist(s)
  • Post-construction survey
  • Pre-construction and post-construction walk-through

The Results

QuietStar Secure worked closely with the ICD 705 Subject Matter Experts / Integrators to complete this project. The room met all unique requirements and exceeded the base requirements of 40dB RF and NIC 45. The client has a comfortable workspace with good aesthetics and high performance. The room can be removed with no damage or impact on the client’s home.