Skip to main content

ICD 705 Space: Secure, Stylish, and Removable

ICD 705 Space: Secure, Stylish, and Removable

QuietStar Secure worked closely with the ICD 705 Subject Matter Experts / Integrators to complete this project. The room met all unique requirements and exceeded the base requirements of 40dB RF and NIC 45. The client has a comfortable workspace with good aesthetics and high performance. The room can be removed with no damage or impact on the client’s leased space.

Quietstar Secure Provided

  • Design & Engineering Services
  • Thorough Submittal Package
  • IAC Acoustics Sentry® Secure Facility
  • Lamvin Sonic Wall Finishes
  • Union Labor
  • Carpet
  • Structural Calculations
  • Structural Steel
  • Installation Oversight
  • Field Validation (utilizing acoustic camera)

Client Requirements

  • 31′- 4″ x 22′-12″ Secure Facility
  • ICD 705
    • Forced entry
    • Acoustic requirement
    • Tempest requirement
  • Architectural finish for executive appointment
  • Unique design requirements:
    • Upper floor required all material into small elevator
    • Union labor for installation

The Opportunity

In this instance an integrator reached out to Quietstar with the opportunity.

Quietstar Secure Provided:

  • Design & Engineering Services
  • Thorough Submittal Package
  • IAC Acoustics Sentry® Secure Facility
    • Panels & joiners
      • Special RF / Tempest details on panels & joiners
    • Noise-Lock® Doors
      • Door hardware
    • Sentry HVAC Silencers
  • Lamvin Sonic Wall Finishes
    • 1″ Sonic Panels®
      • Full height
      • Covering all walls
      • Guilford of Maine Anchorage fabric
      • Magnets – to mount to the IAC panels with no penetration
  • Union Labor
  • Carpet
  • Structural Calculations
  • Structural Steel
  • Installation Oversight
  • Field Validation (utilizing acoustic camera)

The Integrator Provided:

  • Construction Security Plan development
  • Fixed facility checklist development (where applicable)
  • TEMPEST requirements checklist development
  • Necessary forms and preprocessing information
  • Documentation preparation and support for Client / Government Accrediting Agency
  • All documentation on flash media or as specified by client/government AO
  • The Enclosure with QuietStar details
  • Intrusion Detection System
  • Communication / data
  • Waveguides
  • Electrical
  • Split Systems
  • On-site project & construction management
  • Fire suppression
  • Installation / Construction
  • Turnover / Representation through the accreditation process
  • Construction photos (where applicable and allowed)
  • Checklist(s)
  • Post-construction survey
  • Pre-construction and post-construction walk-through

The Results

QuietStar Secure worked closely with the ICD 705 Subject Matter Experts / Integrators to complete this project. The room met all unique requirements and exceeded the base requirements of 40dB RF and NIC 45. The client has a comfortable workspace with good aesthetics and high performance. The room can be removed with no damage or impact on the client’s leased space.

Download Full Case Study

Complete Secure Facility Solutions